New ICSS DSC & ESD System — FERIAN Tanks

New ICSS DSC & ESD System — FERIAN Tanks

New Integrated Control and Safety System (ICSS) installation for scheduled shutdown of 10 live process tanks.

Mechanical Works:

  • Steel fabrication
  • Pipe fabrication
  • Welding
  • Pipe demolish and erection
  • Hot tapping
  • Cold cutting
  • ESD valves erection
  • Non-Destructive Examination (NDT) RT, PT & MT
  • Hydrotest
  • Steel structure erection
  • Pipe support fabrication and erection
  • Sand blast and Painting

Civil Works:

  • Basement foundation
  • Concrete casting
  • Excavation & backfill
Explore

More Projects

E&I Work C3/C4 Storage Tanks at ARAMCO 2025

E&I Work C3/C4 Storage Tanks at ARAMCO

Manpower supply for electrical and instrumentation works on C3/C4 Storage Tanks...

View
E&I Work SRUs Upgrade Project at ARAMCO 2025

E&I Work SRUs Upgrade Project at ARAMCO

Electrical and Instrumentation upgrade works for Sulfur Recovery Units (SRUs) at...

View
Assiut Hydrocracking Complex — ANOPC 2024

Assiut Hydrocracking Complex — ANOPC

Electrical and Instrumentation cable glanding and termination for the Assiut Hyd...

View
E&I Work ZOHR — Phase 3 2025

E&I Work ZOHR — Phase 3

Electrical and Instrumentation works for Phase 3 of the ZOHR gas field developme...

View
GASCO Electrical & Instrumentation Pipe & Conduit Fabrication 2025

GASCO Electrical & Instrumentation Pipe & Conduit Fabrication

Electrical and Instrumentation pipe and conduit fabrication works for GASCO faci...

View
El-Salamah Hospital — New Burn Unit 2024

El-Salamah Hospital — New Burn Unit

Complete electrical, low-current, and life-safety systems for the new Burn Unit...

View